Open kitchen and living space with an island and a view through a glass wall
Home/Journal/Kitchen Remodel Planning Checklist
Kitchens

Kitchen Remodel Planning Checklist: Decisions in the Right Order

A kitchen involves more decisions than any other room, and the order you make them in matters. This checklist walks through what to decide first so the design, the price and the schedule stay aligned.

  • CSLB licensedLicense No. 1146843
  • Design + buildOne in-house team
  • Permits handledPlans, submittals, inspections
  • Orange & LA CountyReply within one business day

Most kitchen remodel delays and budget overruns trace back to decisions made out of order: cabinets ordered before appliances were chosen, a backsplash picked before the outlets were placed, or a layout fixed before anyone checked what was inside a wall. Use this checklist with your designer and kitchen remodeling contractor.

1. Goals and budget

  • List what does not work today: storage, workflow, seating, light, connection to the family room
  • Decide how you cook and entertain, and who uses the kitchen at the same time
  • Set a working budget range and priorities, using our kitchen remodel cost guide

2. Layout

Layout comes first because it drives plumbing, electrical, ventilation and structure.

  • Keep the sink, range and refrigerator in place, or move them?
  • Island or peninsula, and how much seating
  • Clearances for walkways and appliance doors
  • Open the kitchen to the living area? If a wall is structural, see removing a load-bearing wall

3. Appliances

Choose appliances before cabinets, because cabinet sizes, electrical, gas and ventilation are designed around them.

  • Range or cooktop and wall ovens, gas or induction
  • Ventilation hood sized and ducted outside
  • Panel-ready or stainless refrigeration
  • Dishwasher, microwave and any specialty appliances

4. Cabinetry and storage

  • Cabinet style, construction and finish
  • Drawers vs doors in base cabinets, pantry and tall storage
  • Interior organizers, trash and recycling, appliance garages
  • Lead time, which is often one of the longest in the project

5. Surfaces

  • Countertops: quartz, natural stone or porcelain, with edge profile and seams planned
  • Backsplash material and height
  • Flooring that runs through adjoining rooms if walls come down

6. Lighting and electrical

  • General, task and accent lighting, including under-cabinet lights
  • Outlet locations on the island and backsplash
  • Switching and dimming, and compliance with energy rules (see Title 24 for remodels)
  • Whether the panel can handle new loads such as induction

7. Plumbing fixtures

  • Sink type and size, faucet, filtered water, pot filler
  • Garbage disposal and dishwasher location

8. Permits, ordering and schedule

  • Permits for electrical, plumbing, gas, ventilation and structural work (see do you need a permit)
  • HOA approval if any exterior changes, such as a new window or vent
  • Order long-lead items before demolition
  • Plan a temporary kitchen (see living at home during a remodel)

The full sequence is explained in the kitchen remodel timeline.

Rodewe designs and builds kitchens across Orange County, including kitchen remodeling in Irvine, Newport Beach and Laguna Beach.

Related services and guides

FAQ

Frequently asked questions

What should I decide first in a kitchen remodel?
Your goals, budget and layout. The layout drives plumbing, electrical, ventilation and any structural work.
Should I choose appliances before cabinets?
Yes. Cabinet sizes, electrical, gas and ventilation are designed around the appliances.
What has the longest lead time in a kitchen remodel?
Often custom cabinetry, followed by specialty appliances and stone. Order them before demolition.
Do I need a permit for a kitchen remodel?
You usually need one if you change electrical, plumbing, gas, ventilation or structure. Replacing cabinets and countertops alone may not.
How do I keep a kitchen remodel on budget?
Make selections before final pricing, avoid moving plumbing unless it improves the layout, and approve changes in writing.

Ready to start your remodel?

Tell us about your home and goals. We'll respond within one business day with next steps and a clear path to a fixed-scope proposal.

Free consultation

Request a free consultation

Tell us about your project. We reply within one business day.

Please choose a project type.
Please enter a 5-digit ZIP code.
Please choose a timeline.

This form is for homeowners planning a project. We don't accept sales or marketing solicitations.

Call NowFree Quote